Start Dates & Completion Times:
We make every effort to keep to the schedules given but cannot guarantee them, as the most part of our line of work is weather dependant so please note we will make every effort but we have to stress there is no guarantee over the start or finish date neither can a guarantee be given on the time from the preparation work to the completion of the job although we can guarantee every effort will be made by us to make this step run as smoothly and as fast as possible.
Any construction work has its problems. Weather and deliveries can cause delays and difficulties. We give maximum effort to overcome this and take as much care as possible. From Yourselves we require patience and understanding.
Imprinted Concrete:
Your part:
Could you please inform neighbors about the commencement of work as the construction process does involve the scattering of colour and release powder over the surface which can result in dust being blown about.
Please protect immediate areas behind the front and back doors with dust sheets until we leave the site. This will prevent dirt and dust damaging your carpets etc.
In certain cases the installation will involve walking over flower beds and lawns. Could you please remove or protect your favorite plants to prevent damage occurring.
Access may be restricted during the the pouring of concrete and drying period. Can you please discuss with the workmen and make adequate provisions so it does not affect your routine. Access to the job site may be required whilst you are out.
On the day that concrete is being poured can you please make sure all doors and windows are kept closed.
The following services may be required by the workmen: water and electricity.
Colour & Finish
Pattern imprinted concrete is not an exact science. it is designed to reflect real stone. This means the colour and texture will gently change throughout the slab.(Remember this is a slab of concrete)
We do not include any rendering or painting in the quotation.
After the surface has been washed off ready for sealing, please do not lay anything on the surface such as door mats or do any gardening as the surface needs to be as dry and as clean as possible
You may walk on the surface 6 hours after sealing. Driving requires 48 hours or at least 7 days after laying the concrete.
Any construction work has its problems. Weather and deliveries can cause delays and difficulties. We give maximum effort to overcome this and take as much care as possible. From Yourselves we require patience and understanding.
Specification of the Product/Installation
The Driveway shall be constructed of 4" (100mm) concrete slab which is air-entrained (frost proofed) and fibre mesh reinforcement.
Hardcore shall be type 1 Road Stone which is aggregate 40mm to dust, compacted at a depth of 3"-4" (75mm-100mm). This is not needed on paths and patios in most areas.
When the concreting has been completed the site will be closed off using hazard tape. The responsibility of the driveway naturally passes to you to prevent any damage by arriving guests, cats, dogs, postmen etc, so please take care.
The driveway/patio will be left for 24/48 hours to cure after concreting. Joints will then be cut into the surface at approximately 3.5m spacing.
The driveway will be washed to remove the antique release powder. This will expose the pattern and colour, the surface will become dull and lifeless throughout the drying process also touch ups will be also done at this stage as and were the contractor sees fit, remember this is a slab of concrete and the surface can have little imperfections like most natural products.
Vehicles may be parked on the driveway 7 days after concreting or 48 hours after sealing, the sealer is a 1-2 coat application dependant on surface conditions. It protects against oil and algae which requires removal.
The sealer has a lifespan of 12-18 months dependant on weather conditions throughout the year. For a period of 2-4 weeks water may bobble on the surface. This is the same effect that happens to a newly polished car.
The nature of the process can result in variation of colour and depth of imprint, and because of this water formation can be present the depth of water will vary in each situation but generally clears quickly on a dry day. During the process of colouring the concrete and untill washing the surface off there can be excess dust blown around, more so on a windy day or night this is the clients responsibility to protect surrounding areas and warn others within the surrounding area about this dust, Whilst every effort and precaution will be made by the company to ensure the above does not occur, the company shall be under no liability in respect of any defect or damage arising from or as a result of the effects of the process specified or carried out.
PLEASE NOTE - weather has a strong bearing on the start and completion times.